Article Details
The Capacity by Date tool allows you to override defined capacity limits for specific dates. After the date has passed, capacity limits will default back to your usual settings. In this article you will learn how to edit an existing Capacity by Date.
Before You Begin
- You must be in the Admin user group to set capacity limits and manage all associated permissions and settings.
Edit Capacity by Date
- Navigate to Left-hand Navigation: Admin » Capacity.
- Select the Edit icon.
-
Make your changes on the form shown above.
-
Click Update changes.
Related Resources
- Capacity Limits Topic Outline
- Set Location Capacity Limit How-To
- Set Lodging Capacity Limit How-To
- Edit Capacity Limit by Date How-To
- Create Capacity Groups How-To
- Set Animal Icon Capacity How-To
- Enable Availability Calendar How-To
- Capacity Limits Permissions & Settings Reference
Comments
0 comments
Article is closed for comments.